Crown Boiler MT100G Betriebsanleitung

Stöbern Sie online oder laden Sie Betriebsanleitung nach Warmwasserbereiter & Kessel Crown Boiler MT100G herunter. Crown Boiler MT100G Operating instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 70
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
BWC Series
High Effi ciency Gas-Fired Hot Water
Direct Vent Condensing Boilers
INSTALLATION INSTRUCTIONS
These instructions must be affi xed on or adjacent to the boiler.
Models:
BWC150
BWC225
WARNING: Improper installation, adjustment, alteration,
service or maintenance can cause property damage, injury,
or loss of life. For assistance or additional information, con-
sult a quali ed installer, service agency or the gas supplier.
This boiler requires a special venting system. Read these
instructions carefully before installing.
D E S I G N E D T O L E A D
Manufacturer of Hydronic Heating Products
P.O. Box 14818 3633 I. Street
Philadelphia, PA 19134
Tel: (215) 535-8900 • Fax: (215) 535-9736 • www.crownboiler.com
D E S I G N E D T O L E A D
Seitenansicht 0
1 2 3 4 5 6 ... 69 70

Inhaltsverzeichnis

Seite 1 - BWC Series

BWC SeriesHigh Effi ciency Gas-Fired Hot Water Direct Vent Condensing BoilersINSTALLATION INSTRUCTIONS These instructions must be affi xed on or ad

Seite 2

83) Minimum Vent and Air Intake Lengths - Minimum vent length is 2ft. Minimum air inlet length is 2ft.4) Permitted Terminals for Horizontal Venti

Seite 3

9TABLE 6.2a: SUMMARY OF HORIZONTAL VENTING OPTIONS VENT OPTION # 1 2 3 4 5CLASSIFICATION USED IN THIS MANUALHORIZONTAL DIRECT VENTHORIZONTAL DIRECT V

Seite 4 - I Product Description

10FIGURE 6.3a: LOCATION OF VENT TERMINAL RELATIVE TO WINDOWS, DOORS, GRADEFIGURE 6.3b: LOCATION OF VENT TERMINAL RELATIVE TO METERS AND FORCED AIR I

Seite 5 - IV Locating the Boiler

11• If possible, install the vent and air intake terminals on a wall away from the prevailing wind. Reliable operation of this boiler cannot be guara

Seite 6

12TABLE 6.2b: SUMMARY OF VERTICAL VENTING OPTIONS VENT OPTION # 6 7CLASSIFICATION USED IN THIS MANUALVERTICALDIRECT VENTVERTICAL DIRECT VENTILLUSTRATE

Seite 7 - V Air for Ventilation

13TABLE 6.5: PERMISSIBLE VENT SYSTEMS AND PRINCIPLE VENT COMPONENTSMANUFACTURER VENT SYSTEM SIZEWALL THIMBLESHORIZONTAL TERMINATIONVERTICAL TERMINATIO

Seite 8

14B. Removing an Existing Boiler From a Common Chimney Read this only if the BWC boiler is replacing an existing boiler that is being removed fr

Seite 9 - VI Venting

15 2) Assembly of Flex-L-Intl. Star-34 Vent System: a) Star-34 General Notes: • Do not cut Star-34 vent components. • Support ho

Seite 10

16FIGURE 6.8: Z-VENT III CONNECTION TO VENT COLLAR 3) Assembly of Z-Flex Z-Vent III: a) General Notes: • Non-expanded ends of SVE Seri

Seite 11

17 4) Assembly of Heat Fab Saf-T Vent EZ Seal: a) Saf-T Vent General Notes: These instructions cover the installation of Saf-T Vent EZ

Seite 13

18 5) Assembly of Protech FasNSeal a) FasNSeal General Notes: • Do not cut 4” FasNSeal pipe. Consult FasNSeal instructions for method of

Seite 14

19 d) 4” galvanized smoke pipe will fit inside the inlet collar on the BWC boiler. Depending upon the exact OD of the pipe used, it may be

Seite 15 - EQUIVALENT LENGTH

20VII Gas PipingGas piping to the boiler must be sized to deliver adequate gas for the boiler to fire at the nameplate input at an inlet pressure betwe

Seite 16

21VIII System PipingA. General System Piping PrecautionsCAUTIONTHE HEAT EXCHANGER USED IN THE BWC IS MADE FROM A SPECIAL ALUMINUM ALLOY. FAILURE TO T

Seite 17

22Method 1: Primary/Secondary Piping - Boiler in Secondary Loop This method can be used in heat-only applications as shown in Figure 8.2 or with an

Seite 18

Figure 8.2: Piping Method #1 - Heat OnlyFigure 8.3: Piping Method #1 - Heat + Indirect Water Heater 23

Seite 19

24Figure 8.4b: Piping Method #1 - Indirect Water Heater Loop Piping (Shaded)Figure 8.4a: Piping Method #1 - Secondary Loop Piping (Shaded)

Seite 20

25TABLE 8.5: PIPE AND CIRCULATOR SIZING FOR BOILER LOOPBOILER MODEL(a) (b) (c) (d)PIPE SIZE FLOWCIRCULATOR MODELBOILER LOOP MAX EQUIVALENT LENGTH(in N

Seite 21

26TABLE 8.7: FITTING EQUIVALENT LENGTHSFITTINGPIPE SIZE EQUIVALENT LENGTH (ft)90 ELBOW 1 1/4 3.75TURN IN TEE1 1/4 8.00RUN OF TEE 1 1/4 2.50SWING CHEC

Seite 22 - VII Gas Piping

27Method 2: Primary/Secondary Piping - Boiler in Primary Loop This method can be used in heat-only applications as shown in Figure 8.8 or with an in

Seite 23 - VIII System Piping

Table of Contents I. Product Description 2 II. Specifications 2 III. Before Installing 3 IV. Locating The Boile

Seite 24

Figure 8.8: Piping Method #2 - Heat OnlyFigure 8.9: Piping Method #2 - Heat + Indirect Water Heater 28

Seite 25

Figure 8.10a: Piping Method #2 - Secondary Loop Piping (Bolded) Figure 8.10b: Piping Method #2 - Primary Loop Piping (Bolded)29

Seite 26

Figure 8.10c: Piping Method #2 - Indirect Water Heater Loop Piping (Bolded)30Figure 8.11: Piping Method #3 - Direct Connection of Boiler to Heating Sy

Seite 27

31C: Standard Piping Installation Requirements Observe the following guidelines when making the actual installation of the boiler piping:1) The rel

Seite 28

323) The return piping may be connected into the boiler through the back or sides of the boiler by rotating the drain elbow and routing the return pi

Seite 29

33Figure 8.14: Chiller PipingFigure 8.13: Isolation of the Boiler From Oxygenated Water with A Plate Heat Exchanger

Seite 30

34IX Wiring 1) Line Voltage (120 VAC) Connections (Fig 9.1) – The line voltage connections are located in the juncti

Seite 31

Figure 9.1: Wiring Connections Diagram35

Seite 32

Figure 9.2: Ladder Diagram36

Seite 33 - Flow (GPM)

Figure 9.3: Wiring of Isolation Relay for Control of Two Heating Circulators 37

Seite 34

2I Product DescriptionThe BWC is an aluminum gas fired condensing boiler designed for use in forced hot water heating systems requir-ing supply water

Seite 35 - Figure 8.14: Chiller Piping

X Start-up and CheckoutUse the following procedure for initial start-up of the boiler:1) If not already done, flush the system to remove sediment, flux

Seite 36 - IX Wiring

A.•C.B.D.•••1. 6.2. 7.3.4. 8.9.5. 10.11.12.1. 3.2. 4.FOR YOUR SAFETY READ BEFORE LIGHTINGThis appliance does not have a pilot. It is equipped with an

Seite 37

407) Start the boiler using the lighting instructions on page 39. After the boiler is powered up, it should go through the following sequence. Sequ

Seite 38 - Figure 9.2: Ladder Diagram

41Figure 10.2: Gas Valve Detail11) Perform a combustion test. On horizontally vented units, the sample probe may be inserted into the terminal. I

Seite 39

4212) Test any external limits or other controls in accordance with the manufacturer’s instructions.13) Verify that the boiler starts and stops in res

Seite 40 - X Start-up and Checkout

XI Operation1) The BWC boiler uses a microprocessor based control, known as a “MCBA”, to manage all boiler functions including flame supervision a

Seite 41 - OPERATING INSTRUCTIONS

44 In standby mode, it is possible to view both the heating supply set point temperature and the “domestic hot water reference set point”. The “do

Seite 42

STEP + - STORE STEP + - STORE+ ShortShows supply set point when responding to call for heat (Note 1)c 1901DHW reference set point (Note 2)68°F - 144°F

Seite 43

46 3) Two basic types of errors codes are shown on the display: • Soft Lockout Codes – When a soft lockout occurs, the boiler will shut down

Seite 44

Figure 11.4: Outdoor Reset Curve477) The sequence of operation for a BWC series boiler on a call for heat from a thermostat is as described below:

Seite 45 - XI Operation

III Before Installing1) Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict accordance w

Seite 46

XII. Service and Maintenance1) Continuously: a. Keep the area around the boiler free from combustible materials, gasoline and other

Seite 47 - FIGURE 11.2: BASIC MENU TREE

i. Remove the burner and vacuum any dust or lint from the burner. Wipe the inside of the burner with a clean soft cloth. Do not wipe the

Seite 48 - Table 11.3: Boiler Status

50XIII. TroubleshootingA. Troubleshooting problems where no error code is displayed:CONDITION POSSIBLE CAUSESDisplay Blank, Fan off, LWCO lights off

Seite 49

51B. Trouble shooting problems where a soft lockout code is displayed. When a soft lockout occurs, the boiler will shut down and the display will

Seite 50 - XII. Service and Maintenance

52C. Trouble shooting problems where a hard lockout code is displayed. When a hard lockout occurs, the boiler will shut down and the display wil

Seite 51

53XIV PartsThe following parts may be obtained from any Crown distributor. To find the closest Crown distributor, consult the area Crown representativ

Seite 52 - XIII. Troubleshooting

54BWC REPLACEMENT PARTS LISTKEY DESCRIPTIONBWC150 BWC225CROWN PART #QUANTITYCROWN PART #QUANTITY1 Crown Aluminum Nameplate 98-004 1 98-004 12 Aluminum

Seite 53

55BWC REPLACEMENT PARTS LISTKEY DESCRIPTIONBWC150 BWC225CROWN PART #QUANTITYCROWN PART #QUANTITY47 Nylon Glide Foot 1”Dia x 3/4” Long 700111 4 700111

Seite 56 - BWC REPLACEMENT PARTS LIST

4Figure 4.1: Clearances To Combustible Or Non-combustible MaterialTable 4.2: Clearances From Vent Piping To Combustible ConstructionTYPE OF VENT PIPE

Seite 59

60BWC REPLACEMENT PARTS LISTKEY DESCRIPTIONBWC150 BWC225CROWN PART #QUANTITYCROWN PART #QUANTITY89 #6-32 x 13mm Hex x 92mm, Long Standoff 900711 2 900

Seite 61

BWC REPLACEMENT PARTS LISTKEY DESCRIPTIONBWC150 BWC225CROWN PART #QUANTITYCROWN PART #QUANTITYNot Shown 11-1/2” Releasable Nylon Cable Wire Tie 960025

Seite 65

66Appendix A: Special Requirements For Side-Wall Vented AppliancesIn The Commonwealth of MassachusettsIMPORTANTThe Commonwealth of Massachusetts requ

Seite 67

V Air for Ventilation Air for combustion must always be obtained directly from outdoors, however sufficient air for ventilation must still be provid

Seite 68

Manufacturer of Hydronic Heating ProductsP.O. Box 14818 3633 I. StreetPhiladelphia, PA 19134Tel: (215) 535-8900 • Fax: (215) 535-9736 • www.cro

Seite 69

6Figure 5.1: Boiler Installed In A Confined Space, Ventilation Air From Inside• If the total volume of both the boiler room and the room to which the

Seite 70 - Philadelphia, PA 19134

7VI VentingWARNINGFailure to vent this boiler in accordance with these instructions could result in unreliable boiler operation, severe damage to the

Kommentare zu diesen Handbüchern

Keine Kommentare