Crown Boiler CWI345 Spezifikationen

Stöbern Sie online oder laden Sie Spezifikationen nach Warmwasserbereiter & Kessel Crown Boiler CWI345 herunter. Crown Boiler CWI345 Specifications Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 56
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
1
D E S I G N E D T O L E A D
Tel: (215) 535-8900 • Fax: (215) 535-9736 • www.crownboiler.com
Manufacturer of Hydronic Heating Products
P.O. Box 14818 3633 I. Street
Philadelphia, PA 19134
CWI Series
Gas-Fired Natural Draft Water Boilers
INSTALLATION INSTRUCTIONS
These instructions must be affixed on or adjacent to the boiler
WARNING: Improper installation,
adjustment, alteration, service or
maintenance can cause property
damage, injury, or loss of life. For
assistance or additional informa-
tion, consult a qualified installer,
service agency or the gas
supplier. Read these instructions
carefully before installing.
Models:
CWI069
CWI103
CWI138
CWI172
CWI207
CWI241
CWI276
CWI310
CWI345
CWI379
Seitenansicht 0
1 2 3 4 5 6 ... 55 56

Inhaltsverzeichnis

Seite 1 - CWI Series

1D E S I G N E D T O L E A DTel: (215) 535-8900 • Fax: (215) 535-9736 • www.crownboiler.comManufacturer of Hydronic Heating Pro

Seite 2 - I Product Description

10913) Do not install the vent damper in any portion of the vent system which is used by appliances other than the boiler beinginstalled.14) Vent damp

Seite 3 - II Specifications

1110 FIGURE 8: CWI BOILER TYPICAL VENT SYSTEM INSTALLATION AND COMPONENTS FIGURE 9: VENT DAMPER INSTALLATION DETAILS

Seite 4 - IV Locating the Boiler

1211*VII Gas PipingGas piping to the boiler must be sized to deliver adequate gas for the boiler to fire at the nameplate input at a line pressurebet

Seite 5

1312VIII System PipingStandard PipingFigure 11 shows typical boiler system connections on a single zone system. Additional information on hydronic sy

Seite 6

146) Low Water Cut-Off (Required in some situations) - A low water cutoff is required when the boiler is installed aboveradiation. In addition, some

Seite 7

1514 FIGURE 12: INDIRECT WATER HEATER BOILER SIDE PIPING FIGURE 11: STANDARD BOILER PIPING

Seite 8

165) Piping with a Chiller - If the boiler is used in conjunction with a chiller, pipe the boiler and chiller in parallel as shown inFigure 15. Use i

Seite 9 - VI Venting

17 FIGURE 15: BOILER PIPING WITH CHILLER FIGURE 14: ISOLATION OF BOILER FROM SYSTEM WITH A HEAT EXCHANGER16

Seite 10

1817IX TANKLESS HEATER PIPINGIf the CWI is installed with an optional tankless heater, pipe the heater as shown in Figure 17. The components in thissy

Seite 11

19183) Pressure Relief Valve (Required) - Limits the pressure in the tankless heater and piping. Use an ASME constructed valvedesigned for domestic wa

Seite 12 - VII Gas Piping

2Table of ContentsI. Product Description ... 1II. Specifications ...

Seite 13 - VIII System Piping

20IX WiringSingle Zone Wiring1) 120 Volt Wiring - The boiler should be provided with its own 15A branch circuit with fused disconnect. All 120 vol

Seite 14 - Piping for Special Situations

2120 FIGURE 19: WIRING DIAGRAM, INTERMITTENT IGNITION (EI) SYSTEM LESS TANKLESS HEATER FIGURE 20: WIRING DIAGRAM, STANDING PILOT WITH TANKLESS H

Seite 15 - BOILER SIDE PIPING

2221 FIGURE 21: WIRING DIAGRAM, INTERMITTENT IGNITION (EI) SYSTEM WITH TANKLESS HEATERWiring Variations1) Multiple Circulator Zones – Figure 22 sh

Seite 16

2322FIGURE 23: ZONE WIRING USING HONEYWELL V8043F ZONE VALVES(FACTORY WIRING NOT SHOWN - SEE FIGURES 18 - 21)FIGURE 22: CIRCULATOR ZONE WIRING USING

Seite 17

2423CWI Control System – Sequence of Operation(Refer to Figures 18 - 21 for ladder and connection diagrams)Sequence of Operation, Standing Pilot, Less

Seite 18 - IX TANKLESS HEATER PIPING

2524Sequence of Operation, Intermittent Ignition, Less Tankless Heater1) When the boiler is energized, 24 volts is immediately applied to terminals

Seite 19

26XI Start-up and CheckoutUse the following procedure for initial start-up of the boiler:1) Make sure that the boiler and system are filled with wate

Seite 20 - IX Wiring

27WARNING•NEVER USE A FLAME TO CHECK FOR GAS LEAKS.• MAKE SURE THAT THE AREA AROUND THE BOILER IS CLEAR AND FREE FROM COMBUSTIBLE

Seite 21 - (NOTE 2)

282715) Check the manifold pressure and adjust if necessary. To do this, use the following procedure:a) Connect a manometer to the inlet pressure tap

Seite 22 - Wiring Variations

292816) Test thermostat operation while the boiler is running. Turn the thermostat to the lowest setting. For standing pilot boilermodels, pilot burne

Seite 23

3TABLE 1: CWI SPECIFICATIONS2II SpecificationsFIGURE 1: CWI BOILERS - GENERAL CONFIGURATION

Seite 24

30LIGHTING INSTRUCTIONS FOR BOILERS EQUIPPED WITH HONEYWELLVR8200 AND VR8300 SERIES GAS VALVES (STANDING PILOT)29A. This appliance has a pilot which

Seite 25

3130LIGHTING INSTRUCTIONS FOR BOILERS EQUIPPED WITH ROBERTSHAW7000ERHC SERIES GAS VALVES (STANDING PILOT)A. This appliance has a pilot which must be

Seite 26 - XI Start-up and Checkout

3231LIGHTING INSTRUCTIONS FOR BOILERS EQUIPPED WITH HONEYWELLVR8204 AND VR8304 SERIES GAS VALVES (INTERMITTENT PILOT)A. This appliance is equipped wi

Seite 27

3332LIGHTING INSTRUCTIONS FOR BOILERS EQUIPPED WITH ROBERTSHAW7000DERHC SERIES GAS VALVES (INTERMITTENT PILOT)A. This appliance is equipped with an i

Seite 28

34 FIGURE 28a: GAS VALVE DETAIL - HONEYWELL VR8204 AND VR8304 (INTERMITTENT IGNITION) FIGURE 27a: GAS VALVE DETAIL - HONEYWELL VR8200 OR VR830

Seite 29

3534XI Service and MaintenanceThe following routine maintenance should be performed on an annual basis:1) Turn off electrical power and gas supply to

Seite 30 - TO TURN OFF GAS TO APPLIANCE

36Heat Exchanger Cleaning Procedure1) Turn off electrical power and gas supply to the boiler.2) Disconnect the damper and vent connector from the boil

Seite 31

3736XIII TroubleshootingThe following pages contain troubleshooting charts for use in diagnosing control problems. To use these charts, go tothe box

Seite 32 - OPERATING INSTRUCTIONS

38Troubleshooting Chart for CWI Boilers Without Tankless HeatersCaution: Read page 36 before attempting to use this chart37Boiler Equipped With Dampe

Seite 33

3938Main burners light?24 volts across B1 &B2 ?Refer to standing pilot or intermittent ignition troubleshooting chart (page 41 or 42).*Defective d

Seite 34

43III Before Installing1) Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict accordance

Seite 35 - XI Service and Maintenance

4039Troubleshooting Chart for CWI Boilers Equipped with Tankless Heaters and DampersCaution: Read page 36 before attempting to use this chartNo call f

Seite 36

4140120 volts across terminals at circulator?Do burnersshut dow n before gage temp exceeds high limit setting +15F?Circulator start?120 volts at C1&am

Seite 37 - XIII Troubleshooting

42Standing Pilot Ignition System Troubleshooting ChartPilot lit?Main burners light?YTurn control on gas valve to PILOT. Depress red button and light

Seite 38

4342Does spark stop when pilot lights?24 volts across terminals 2&3 at S8600?Spark across ignitor/sensor gap?YCan you hear sparking?*Faulty S8600

Seite 39

4443XIV PARTS The following parts may be obtained from any Crown distributor. To find the closest Crown distributor, consult the area Crownrepresent

Seite 41

4645** These Valves Piped in Series to Provide Redundent Shut-off***1/4 Pilot Tubing Used with Robertshaw Valves69 103 138 172 207 241 276310 345 3794

Seite 43

484769 103 138 172 207 241 276310 345 37975 LEFT SIDE JACKET PANEL 1 ea. 850301 850301 850301 850301 8503012 8503012 8503012 8503015 8503015 850301576

Seite 45

54• If the right side 24” service clearance is reduced, adequate clearance must be maintained to easily read and access thecontrols. Alternatively, ac

Seite 46

50A. Before Installing1) Thoroughly inspect the cast iron heat exchanger for any shipping damage, i.e. cracks in the castings, broken lugs orpunctures

Seite 47

5150FIGURE A1: BASE, HEAT EXCHANGER, FLUE COLLECTOR ASSEMBLY

Seite 48

52side panel installed in the previous step and secure with three #10 sheet metal screws.5) Install the left side panel in the same manner as the righ

Seite 49

5352FIGURE A2: JACKET INSTALLATION

Seite 50

54F. Electrical Wiring Connections(Also refer to wiring diagrams in Part X of the installation manual)1) A pre-wired limit control (L8148E or L8124E)

Seite 51

5554FIGURE A3: TAPPING LOCATIONS (SEE TEXT FOR TAPPING USES)

Seite 52 - D. Gas Valve Installation

56Tel: (215) 535-8900 • Fax: (215) 535-9736 • www.crownboiler.comManufacturer of Hydronic Heating ProductsP.O. Box 14818 3633 I. StreetPhiladelph

Seite 53

6• Caulking and sealants are applied to areas such as joints around window and door frames, between sole plates andfloors, between wall-ceiling joints

Seite 54 - G. Complete Installation

76 FIGURE 4: ALL AIR FROM OUTDOORS, VENTILATED CRAWL SPACE AND ATTIC FIGURE 5: ALL AIR FROM OUTDOORS, VIA VENTILAT

Seite 55

8 FIGURE 6: ALL AIR FROM OUTDOORS, USING OPENINGS INTO BOILER ROOM FIGURE 7: ALL AIR FROM OUTDOORS, USING HORIZONTAL D

Seite 56 - Philadelphia, PA 19134

98• The “free area” of an opening takes into account the blocking effect of mesh, grills, and louvers. Where screens are used,they must be no finer t

Kommentare zu diesen Handbüchern

Keine Kommentare